How this calculator works
Road base is specified by its finished, compacted depth. The calculator multiplies your area by that depth to get the finished volume.
Finished volume = Area × Finished compacted depth
To estimate the loose material to order, open Compaction / yield and enter the figure your supplier or project specification gives:
Loose volume = Finished volume ÷ (1 − volume reduction)
Loose volume = Finished volume ÷ loose-to-compacted yield
The Extra material / handling allowance, if you add one, is applied after this adjustment.
About road base
Road base is a graded aggregate — a blend of stone sizes with fines — that is placed and compacted to support a surface above it. Product names and specifications vary by region.
Section design depends on the project
How thick a road base needs to be depends on traffic, the ground beneath, drainage and climate. FHWA guidance for rural gravel roads, for example, changes layer thickness with heavy-truck traffic and subgrade support. This calculator does not recommend a depth; use the depth from your plan or specification.
Compaction is supplied by you
There is no universal compaction factor. Engineering targets such as “95% of maximum dry density” describe a density test, not an extra 5% of material. Leave the adjustment off unless you have a figure for your product or project.
Related projects
Building a driveway with several layers? Use the Gravel Driveway Calculator. Under interlocking concrete pavers, CMHA guidance calls for locally approved road-base aggregate or dense-graded aggregate close to ASTM D2940 — the Paver Base Calculator covers base and bedding. For a general volume, use the Gravel Calculator.
Worked example
Example: 30 ft × 20 ft at 6 in finished, supplier yield of 0.85
- Area: 30 ft × 20 ft = 600 ft²
- Finished volume: 600 × 0.5 ft = 300 ft³ = 11.11 yd³
- Loose volume: 11.11 ÷ 0.85 = 13.07 yd³
Result: 13.07 cubic yards loose to order. The depth and yield are example inputs, not recommendations.
Frequently asked questions
How thick should road base be?
It depends on what the base supports and on site conditions. Use the thickness in your plan or specification; the calculator does not supply one.
What is a loose-to-compacted yield?
A figure some suppliers or specifications give for how much compacted volume you get from a loose volume. Loose volume = finished volume ÷ yield.
Can I estimate road base weight?
Yes, with your supplier’s bulk density for the exact product. Make sure the density condition matches the volume — a loose density for the loose order volume.
Sources & methodology
No source supplies a road base depth, compaction factor or density. Sources relevant to this page:
-
NIST Guide to the SI (SP 811), Appendix B.8 — Factors for units listed alphabetically
Used in calculations: Length conversion constants used in every calculation.
-
ASTM C29/C29M-17a — Standard Test Method for Bulk Density (“Unit Weight”) and Voids in Aggregate
Methodology only: Explains that bulk density includes the spaces between particles and differs between loose and compacted conditions.
-
Gravel Roads: Construction and Maintenance Guide (FHWA-OTS-15-0002), Appendix A Table 3
Explanatory context only: Explanatory context only — road layer thickness depends on traffic and subgrade; never a driveway default.
-
Unpaved Roads Chemical Treatments, Chapter 6
Explanatory context only: Explanatory context only — wearing-course guidance for treated unpaved roads, not a driveway default.
-
Proper Concrete Paver Base and Depth: What to Know and Why It Matters
Explanatory context only: Explanatory context only — base-material suitability and the limits of ideal-condition depths.